“ATESH” Disrupts Enemy’s Logistics on a New Railway Section in Donetsk Region

June 1, 2025

Below, an excerpt from the ATESH Telegram channel, translated via Google and OFP:

Agents of our movement carried out sabotage, disabling a relay cabinet on a new section of the Volnovakha-Mariupol railway built by the occupiers. As a result, the signaling and train control systems were disrupted.

This section is a key element of the new Taganrog-Mariupol railway line, which the Russians hastily launched to transfer fuel, equipment and ammunition directly to the front line, bypassing the Crimean Bridge. It allows delivery of goods from Rostov faster and with less risk. Damage to infrastructure in this direction disrupts supplies and increases the vulnerability of the occupation army.

We continue to strike at critical points of the enemy. Each blow reduces their combat capability.

Write to our coordinator: @ruslan_atesh_ua

3 comments

  1. Good! But, more needs to be done to demolish key sections of this railroad. It’s currently the most important link between mafia land to the frontline.

  2. Every time I read about the exploits of Atesh I just wish there was a million of them.

Enter respectful comments here: